Thursday, July 19, 2012

Update 7/16/12:  Working while it's Warm or The Ramble that wasn't...

Sierra and I ran out to JTS to meet with Brian and Allan Ratliff, as well as work with  John Griffin on the layout.  It was a tad warm with temp's in the mid 90's.  The day was made pleasant with the occasional breeze (gust).  The goal was to install the new, beautiful, bridge that Gary Conley built for the G-scale.  Additionally, 60(+) feet of track was added to the mainline as well as two staging sidings.  

Sierra and I discuss the the project.  John is already testing the new track.


Allan took this about 2:00 as I was wiring the power switch for the new staging tracks.
Gary's bridge is in the upper left of the above image.  Photo by John.



John shot this image of  Gary's bridge, the temporary trestle and the (crooked) staging sidings.
(I'll straighten the inner siding on the next work day).

    All track was tested in both directions.  A few hummocks and bumps were present but the equipment ran through without any issues.  The track needs ballasting.  The center of this area will receive some rock piles, soil and structures to give some detail to the flat topped planter.  
     We are running low on rail clamps and will need to purchase some if any additional track is to be added.  I noticed that the original planter beds are quite a bit lower than the both of the new raised beds.  The plan is to set the laser level and raise the height of the original raised beds then re-set the track.  Gary plans on building new bridges to replace the original units.   The plan for Fall is to start the picnic shelter for the G-scale.  
More to follow, Don.


Thursday, April 26, 2012

So I'm a Blogging Flake...

I apologize in the delay of updating the blog.  Quite a bit has gone on since the last installment.

Over President's weekend the Family and I ventured out to Joshua Tree.  We enjoyed our visit and worked on the yard crib.  John Griffin had been kind enough to stockpile redwood planks,  redwood posts and soil for the event.

The Gage's working on the Yard Crib- Lula and Belle were supervising


Ten days pass and I receive a note from John indicating that he has filled the crib and is awaiting his next assignment.  Wow this guy works amazingly fast!

Filled Crib by John Griffin
I made a one day pilgrimage to the Club to assist on minor repairs and tweaking of the rail.  Wiring has been updated to allow for both the upper loop and lower loop to be run from one transformer.  An operating pedestal has been added to make operating more comfortable from a fixed transformer. 

John's D&S Mogul pulling his red-doored Dynamite car
Gary Conley has been working on a custom Howe Truss bridge to connect the mainline to the yard crib and loop.  As of April 20th the Bridge is 95% complete and ready for installation.  More to follow... DG

Monday, November 14, 2011

Rudy Run 2011







G-scale is running!

Well, I promised to have the upper loop functional for the Rudy Run and by gosh we did it! Sierra (my 16 year old daughter) and I arrived at JT&S about 12:30 on Friday 11/11/11 and set up camp. By 1:00 we were installing track panels and figuring curves for the new main. With the Help of John Griffin, Rob Moore (a new member from Canada), Sierra and I managed to fit, assemble and ballast another 75 (+) feet of track on the upper loop. By 4:45 we were running trains and working out the kinks in the rail.

On Saturday John and Rob ran trains between the rain squalls while Sierra and I worked on track power. Three 14-2 direct burial track power feeders were installed and tested by 4:30. Bob Whitt ran his radio controlled Aristocraft U25B to test the main. He made several circuits on the new loop and never stopped grinning.

Sunday was clear with only an occasional cloud. I realigned an overly tight curve (less than 3' radius) to be a lose 4' radius curve to ease train operation. I then attended the board meeting. I was reintroduced to the attending members and received a warm welcome, Thanks everybody! Sierra and a host of others took turns running battery radio control trains until we had to leave at noon.

Special thanks go to Mrs. Boardman (Miles wife) for the generous donation of track, buildings and details from Miles railroad.

Another thank you to Bob Whitt for removing the track and delivering it to JT&S.

We used a good amount of track this weekend but still have a lot more.

Next will be to start on the passing sidings and staging yard.

Stay tuned!

Don

Wednesday, October 19, 2011

G-scale Progress



Hello, I spent the morning of Sunday 10/16 placing the first railroad ties between the 7 1/2" gauge and the G-scale to help retain the slope. John Griffin came by and helped move soil. A total of ten ties were installed that will support the slope. A second row of ties, and possibly a few additional will be added.


While there, John and I managed to get the lower loop operational. A few areas of G-scale retaining wall will need to be added to keep the upper railroad's soil from becoming the lower railroad's.
Upon leveling the roadbed, with a laser, I discovered that a large quantity of fill will be necessary to keep the track level. After some soul searching, I have opted to run a grade of 2% or less up from the new planter to the high point at the west bridge. Another 2% grade will be installed from the west bridge to the original planter boxes and bridges. Almost all G-scale locomotives made today should be able to climb a 2% grade with a moderate sized train, so everybody should be happy.
We seem to have enough track to complete a full loop on the new mainline. Although railroads seem to eat track at an alarming rate.

Wednesday, September 7, 2011

Back out to JTS- 8/31/11

I headed out to Joshua Tree for another visit with Bob and John. Bob Whitt and I spent part of the morning assessing the buildings Miles left for us. All in all a good mix of buildings that should look great on the railroad.

Bob and I then met up with John at the Railroad. We did some arm waving and yelling (that is how everyone expresses themselves, isn't it?), then got down to the business at hand. The raised bed was measured and the size was adjusted to allow for our minimum diameter to be 8' or LGB 1600(0) series curves. The planter walls were realigned after some further measuring, arm waving and minor yelling. Since we were having so much fun, we decided to move some rocks so John will know where we need more dirt.

The three of us also discussed a picnic enclosure. The design we currently agreed upon is a smaller version of the main picnic enclosure. The structure will be built of lumber, painted green, with a corrugated metal roof, facing the same direction as the main structure. Some form of weather resistant storage cabinets will be along the south wall, and a custom dirt floor will be used to support the picnic bench. Power can be run to the enclosure using the existing line that runs to the G-scale convenience outlets.

We will be styling soon,

Don

Sunday, July 17, 2011

JTSRR G Scale Update


One of the M.O.W. Crews hard at work on the Right of Way
Photo by John Griffin

Hello,
I have been asked to return to the task of G scale Coordinator for JTS. I'll give a little background before I give the update. My name is Don Gage, I am an avid kitbasher and scratchbuilder in G scale and have been doing so for about 20 years. To date I have designed and installed over a dozen railroads, mainly for friends in and around Southern California. I have a website of some of my modeling at:
http://4largescale.com/DonGage/index.htm

Myself along with the help of Alec and Eric Bauer built the first three iterations of a G scale railroad at JTS. So if there is something you didn't like about the earlier railroads, I'm the one to blame.

I have met with the President and several coordinators and board members to discuss the future of G scale at JTS. I created a clearance gauge that will be used to cut back the slope on the slope between the G scale area and 7.5" mainline insuring enough space is kept between the areas. The plan is to build a retaining wall to support the foot of the slope and the upper plateau. Bob Whitt, John Griffin and I have discussed the changes that we plan on for the immediate future. Our goals include improving the industrial loops operation and completing the new and improved mainline loop. The loops will be fully operational for both raidio control and track powered equipment.

Bob Whitt donated over 24 full size railroad ties for the retaining wall between the G and 7.5".

Miles Boardman's wife has donated track, buildings and other items for use at JTS after Miles passing, I greatly appreciate the kind gesture. Miles was a good friend of JTS and the prior G scale coordinator at JTS, he will be missed. We are grateful to be able to keep his memory alive by incorporating his railroad with ours.

More to follow,
Don